Skip to content

Līdumu karjera mini-treils #1 Traditional Cache

Hidden : 7/8/2024
Difficulty:
1.5 out of 5
Terrain:
1.5 out of 5

Size: Size:   micro (micro)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:


Līdumu karjera mini-treils

Aicinām Jūs uz 4km garu ceļu, kurš jūs aizvedīs uz Līdumu karjeru. Ceļā varat doties gan ar kājām, gan riteni vai kādu citu pārvietošanās līdzekli. Ceļā sastapsiet gan ūdens uzpildes staciju, gan velo mini-servisa stacijas. Veiksmīgu piedzīvojumu!

Jāņem līdzi pašiem savs rakstāmais!

-------------------

#1 - Olaines pilsētas notekūdeņu attīrīšanas iekārtas (NAI)

2009.gada nogalē tika atklātas jaunas Olaines pilsētas NAI.  Olaines pilsētas NAI paredz notekūdeņu mehānisko attīrīšanu un bioloģisko attīrīšanu, izmantojot aktīvo dūņu tehnoloģiju organisko vielu (BSP un ĶSP), kā arī slāpekļa atdalīšanai. Dūņu apsaimniekošanai paredzēta mehāniskā dūņu atūdeņošana centrifūgā un to uzglabāšana dūņu novietnē. Projektētā notekūdeņu attīrīšanas iekārtu jauda ir 4471 m3/dnn (vidējā plūsma sausā laikā). Maksimālā plūsma lietus laikā – 8040 m3/dnn. Uz NAI tiek novadīti notekūdeņi no Olaines pilsētas iedzīvotājiem, iestādēm un ražošanas uzņēmumiem.

Olaines pilsētā ir vairākas lietus ūdeņu izplūdes vietas Olaines pilsētas kanālā. Pilsētas lietus ūdeņi, izņemot rūpnieciskās zonas lietus ūdeņus, netiek attīrīti. Rūpnieciskās zonas lietus ūdeņi kopā ar tehnisko ūdeni tiek novadīti uz attīrīšanas iekārtām.

___________

ENG

Mini-trail of the Līdumu quarry

We invite you to a 4 km long road that will take you to the Līdumu quarry. You can walk, travel by bike or by any other transportation. During the trip you will find water filling stations and bicycle mini-service stations. Have a successful adventure!

You have to bring your own pen!

-------------------

#1 - Olaine city wastewater treatment plant (WWTP)

At the end of 2009, a new WWTP of Olaine city was opened. The WWTP of Olaine envisages mechanical treatment and biological treatment of wastewater using activated sludge technology for the removal of organic substances (BOD and COD) and nitrogen. Mechanical dewatering of sludge in a centrifuge and its storage in a sludge storage facility are intended for sludge management. The designed capacity of the wastewater treatment plant is 4471 m3/dnn (average flow in dry weather). Maximum flow during rain – 8040 m3/dnn. Sewage from residents, institutions and production companies of Olaine is discharged to the WWTP.

The city of Olaine has several rainwater discharge points in Olaine city canal. The city's rainwater, except for the rainwater of the industrial area, is not treated. The rainwater of the industrial area together with the technical water is directed to the treatment facilities.

Additional Hints (Decrypt)

YI Bmbyf RAT Bnx

Decryption Key

A|B|C|D|E|F|G|H|I|J|K|L|M
-------------------------
N|O|P|Q|R|S|T|U|V|W|X|Y|Z

(letter above equals below, and vice versa)